Hyper-K
Hyper-Kamiokande
The next-generation 258-kt water-Cherenkov detector. Eight times the fiducial volume of Super-Kamiokande, designed to study δ_CP, the mass ordering, atmospheric and solar oscillations, supernova bursts, and proton decay.
Specifications
| Full name | Hyper-Kamiokande |
|---|---|
| Host institution | University of Tokyo, ICRR & KEK |
| Spokesperson | F. Di Lodovico |
| Status | Under construction |
| First data | 2027 |
| Location | Kamioka, Gifu, Japan |
| Technique | Water-Cherenkov detector |
| Channel(s) | Atmospheric, accelerator (J-PARC), solar, supernova ν |
| Depth | 650 m below Mt. Nijugo |
| Fiducial mass / volume | 188 kt (fiducial) of ultra-pure water |
| Baseline | 295 km (J-PARC beam) |
| Energy range | 5 MeV – 10 GeV |
Sensitivity CP-violation 5σ discovery for ~60% of δ_CP within 10 yr; ~10⁵ events from a 10-kpc supernova.
Recent result
Cavern excavation completed in 2024; PMT mass-production ongoing. First light scheduled for 2027.
Detector architecture
Hyper-Kamiokande will be a 258-kt cylindrical water Cherenkov detector — almost 8× the Super-K fiducial volume — located 8 km from the Super-K site at a depth of 600 m. The instrument uses 40,000 50-cm PMTs at 20% photocathode coverage; the design choice of slightly lower coverage compared to Super-K reflects the larger relative-to-absolute precision target.
The Hyper-K detector serves as the far end of an upgraded J-PARC beam at 1.3 MW, with a new intermediate water Cherenkov detector (IWCD) at ~1 km baseline for systematic-uncertainty reduction.
Scientific case
The primary goals are δCP at 5σ for ~60% of values within 10 years of running; mass ordering at >3σ in the same period; and precision oscillation measurements at the few-percent level. Secondary goals: proton-decay searches at sensitivity 10× Super-K, ~10⁵ supernova-burst neutrinos from a 10 kpc CCSN, and atmospheric-ν measurements at the 1% level.
Hyper-K is timed to overlap with DUNE: the two complementary apparatuses (off-axis narrow-band beam vs wide-band on-axis beam, water Cherenkov vs LArTPC) provide cross-systematic redundancy on the same physics question.
Milestones
- 2015 Letter of Intent submitted.
- 2020 Project formally approved by MEXT and KEK.
- 2021 Excavation of the underground cavern begins.
- 2024 Cavern excavation complete; tank construction begins.
- 2027 First beam expected; commissioning runs.
- 2032 δ_CP at 5σ for favourable values; full physics programme.
Recent highlights
The 2024 cavern-excavation milestone places Hyper-K firmly on track for 2027 first beam — only one year behind the original 2026 target. PMT mass-production runs at Hamamatsu have delivered ~85% of the required 40,000 modules through 2024.
Future plans
The IWCD intermediate detector and the upgraded ND280 near detector at J-PARC are part of the same commissioning timeline. A second detector tank in Korea (KNO/T2HKK) at 1100 km baseline is under technical study and would resolve the residual mass-ordering ambiguity even in the case of unfavourable δ_CP.
Collaboration
| Collaboration size | ≈ 500 members, 90 institutions in 22 countries |
|---|
References
- Hyper-K Collab., Design Report, arXiv:1805.04163
@misc{experiment-hyper-k,
author = {Neutrino Research Hub Editors},
title = {Hyper-K — Detector profile},
howpublished = {\\url{https://neutrino-research.com/experiments/hyper-k}},
year = {2026},
publisher = {Neutrino Research Hub},
note = {Accessed 2026-11-26}
} Neutrino Research Hub Editors (2026). Hyper-K — Detector profile. Neutrino Research Hub. https://neutrino-research.com/experiments/hyper-k
Neutrino Research Hub Editors. "Hyper-K — Detector profile." Neutrino Research Hub, 2026, https://neutrino-research.com/experiments/hyper-k.